#23 Add post: Anatomy of a small change: from a phone prompt to production

Scalone
bajdev scala 1 commity/ów z bajdev/post/commit-link-case-study do bajdev/main 12 godzin temu
bajdev skomentował 12 godzin temu

A case study following v0.5.3 (the About page commit link) from the phone prompt through implementation, tests, PR, merge, the automatic deploy and the post-deploy checks, with a sequence diagram and real timings. Content only.

A case study following v0.5.3 (the About page commit link) from the phone prompt through implementation, tests, PR, merge, the automatic deploy and the post-deploy checks, with a sequence diagram and real timings. Content only.
Ten pull request został pomyślnie scalony!
Zaloguj się, aby dołączyć do tej rozmowy.
Brak etykiety
Brak kamienia milowego
Brak przypisania
1 uczestników
Ładowanie...
Anuluj
Zapisz
Nie ma jeszcze treści.