#23 Add post: Anatomy of a small change: from a phone prompt to production

已合并
bajdev 于 12 小时之前 将 1 次代码提交从 bajdev/post/commit-link-case-study合并至 bajdev/main

A case study following v0.5.3 (the About page commit link) from the phone prompt through implementation, tests, PR, merge, the automatic deploy and the post-deploy checks, with a sequence diagram and real timings. Content only.

A case study following v0.5.3 (the About page commit link) from the phone prompt through implementation, tests, PR, merge, the automatic deploy and the post-deploy checks, with a sequence diagram and real timings. Content only.
该合并请求已经成功合并!
登录 并参与到对话中。
未选择标签
未选择里程碑
未指派成员
1 名参与者
正在加载...
取消
保存
这个人很懒,什么都没留下。